← Portfolio Infraestructura · On-site · 2025

Regional Edge Node

Full modernization of an edge node (CDN and apps): racks, Cat 6A/10G cabling, AI-ready hardware, triple failover and monitored solar power.

Edge node server rack
3x Link failover
20G Fiber + Starlink
10G Cat 6A cabling
Solar Monitored power
01

The challenge

A node serving CDN and web apps in the region was saturating: legacy cabling, limited data bus between servers and no real power or link backup.

02

The solution

We migrated to new racks and equipment with Cat 6A (10G) cabling, enabled AI-ready hardware (GPU) and built a three-provider failover: two fiber links (up to 20G) and an enterprise Starlink satellite antenna. We added solar power with automatic generator transfer and a monitoring system (Savix) for servers, solar output and network status.

03

The result

Client services doubled or tripled in production, zero interruptions during a fiber cut and an AI-ready foundation.

// Project phases
01 Hardware migration

New racks and equipment with Cat 6A (10G) cabling and AI-ready hardware (GPU).

02 Triple failover

Redundancy with three providers: two fiber links (up to 20G) and an enterprise Starlink antenna.

03 Power and monitoring

Solar power with automatic generator transfer and monitoring (Savix) of servers, power and network.

// Equipment & technologies
Cat 6A / 10GFibra hasta 20GStarlink empresarialFailover 3 ISPHardware GPU / IASolar + generadorMonitoreo Savix
New rack with structured cabling
New rack frame before assembly
Compact compute nodes
Server internals: CPU and memory for AI
Patch panel and switch installation
Rack cable combing
Rack cable management
High-speed managed switch
// Other projects

Ready to take your business to the next level?

Get a quote →